Installation · Flush-to-wall line

How to install a flush-to-wall door

A flush-to-wall door is not fitted: it is built together with the wall. The frame goes in first, not afterwards.

È la differenza che spiazza chi ci arriva da una porta normale, e vale sia sul cartongesso sia sulla muratura. Qui sotto ci sono le fasi nell’ordine in cui vanno eseguite, trascritte dallo schema che diamo ai nostri installatori. Il documento le presenta in twelve panels for each version: two of the twelve are not operations; they show the push model and the pull model.

If, on the other hand, your door is a pocket sliding door, la sequenza è un’altra e comincia molto prima: c’è una guida dedicata, con il controtelaio e l’anta.

First of all

Two things to know before you open the box

In both versions the structure is prepared around the door, with the frame already in hand. You do not build the wall and then cut the opening into it.

Opening direction: it depends on the model

Drawing of the push-open model: the flush leaf opens away from the viewer
Push-open model
Drawing of the pull-open model: the flush leaf opens towards the viewer
Pull-open model

Sull’Article 220 il modello a spingere e quello a tirare sono due schemi distinti, e il verso va deciso all’ordine.

Sull’Art. 220 RME EasyWall it is not: the data sheet explicitly states that the same door can be installed both push-open and pull-open, left- or right-handed. If you are not sure which of the two you have on site, ask us before you start.

The recess is built around the actual frame

È il motivo per cui il filomuro si ordina all’inizio dei lavori e non alla fine: serve il telaio, non le misure del vano.

Le misure a catalogo partono dall’esterno telaio: da 67 to 97 cm sull’Art. 220, da 70 to 100 cm sull’EasyWall. Sono nella product line page.

Version 01

Drywall partition

Nine operations, from the frame in its recess to the finished wall.

  1. Prepare the structure

    Fit the drywall studs around the door, forming the recess that will take the frame.

  2. Set the door with its frame in the recess

    Balance the door on a wedge, leaving 6 mm above the floor. È la stessa quota che serve poi per registrare le cerniere: l’anta non deve mai lavorare appoggiata al pavimento.

  3. Metti a piombo e prova l’apertura

    Before fixing anything, plumb it and start testing opening and closing. Whatever does not work now will not work later either, once the wall is closed.

  4. Screw the frame to the structure

    Fix the frame to the studs with self-drilling screws.

  5. Screw the boards onto the edge of the frame

    The drywall boards are screwed up against the edge of the frame: this is where the continuity between leaf and wall begins.

  6. Complete the wall

    Close the whole wall, not just the area around the opening.

  7. Fill between frame and drywall

    Using a ready-mixed filler paste: our installation diagram specifies Polyfilla F200.

  8. Paint both faces together

    The document recommends that you pitturare entrambi i lati dell’anta contemporaneamente. Non è una questione di tinta: un pannello verniciato prima da un lato e poi dall’altro assorbe umidità in modo diseguale e tende a imbarcarsi.

  9. Adjust the hinges

    L’ultima operazione, e si fa a parete finita. C’è una dedicated guide.

Il punto di non ritorno è l’operazione 5. Once the boards are screwed against the frame, the wall has to be reopened to work on the frame again. All plumb and opening checks must be completed beforehand.

On drywall, no mesh is used: quella appartiene alla versione in muratura, dove serve a legare l’intonaco al telaio.

Version 02

Masonry wall

Nine operations. The whole fixing method changes, and three things appear that are not used on drywall: spacers, wall anchors and mesh.

  1. Position the frame with the spacers

    The aluminum frame is installed with the stiffening spacers, which hold its shape while everything else sets.

  2. Set the door with its frame in the recess

    Balance the door on a wedge, leaving 6 mm above the floor: the same clearance as in the drywall version. Then plumb the door.

  3. Set the wall anchors

    Fix the frame to the masonry by setting the wall anchors in mortar, avendo l’accortezza di provare il funzionamento della porta while you do it.

  4. Apply the mesh supplied

    Lay it overlapping the aluminum frame and the masonry: è ciò che impedisce all’intonaco di creparsi lungo la giunzione. In questa fase servono piccoli aggiustamenti.

  5. Fill between frame and masonry

    Using the same ready-mixed filler paste: here too the diagram specifies Polyfilla F200.

  6. Leave the spacers in place until the cement is dry

    The document specifies twelve hours. Removing the spacers earlier means letting the frame move while the cement sets, and on a flush door a single millimeter shows.

  7. Skim the walls flush with the frame

    The skim coat must be applied following the plaster line set by the frame: it is the frame that sets the level, not the wall.

  8. Paint both faces together

    As with drywall: entrambi i lati dell’anta contemporaneamente, so that it does not warp.

  9. Adjust the hinges

    They adjust on three axes, once the wall is finished. The procedure is in the adjustment guide.

Il punto di non ritorno è l’operazione 3. Once the wall anchors are set, the frame stays where it is. That is why the document insists on testing how the door works while the anchors are being set, not afterwards.

After installation

Adjustments are made once the wall is finished

A flush-to-wall door is all about alignment: even one millimeter out of place shows. But the fine adjustments are not made during installation; they are made afterwards, on the hinges and on the strike plate.

A case not covered above?

Write to us before you start

The pocket sliding door ha una guida sua. Restano i casi che qui non ci sono: telaio già murato, spessori fuori standard, vani irregolari. Dicci com’è fatta la parete e a che punto è il cantiere, e ti mandiamo lo schema giusto prima che qualcuno stenda l’intonaco.